How to hire a plumber, roofer or usta in Istanbul without getting ripped off
3 min read · Updated
Short answer
Get the scope and price in writing before work starts, itemised in lira, with whether VAT (KDV) is included. Compare at least two quotes for anything big, pay in stages linked to finished work rather than everything upfront, ask for photos before and after, and be wary of anyone who wants to open walls 'to have a look' or won't put a price in writing.
Finding a good tradesperson is hard anywhere. In a new country, in a language you don't speak, it's harder. Foreigners in Istanbul tell the same stories: the plumber who said "yarın" (tomorrow) and never came, the price that doubled once work started, the leak that came back a month later.
Most of this is avoidable with a few habits.
Before anyone comes
Send photos or a video first. Most problems can be roughly judged from a picture: a leak, a stain, a cracked tile, a boiler error. It saves a wasted visit and gives you a first idea of scope.
Describe it simply. "Water stain on bedroom ceiling, top floor, worse after rain." Our glossary of Turkish repair words helps if you're messaging a Turkish-only tradesperson.
Ask how they'll find the cause. For leaks especially, the answer should involve testing, not breaking walls at random.
The quote: what it should include
A proper written quote, even a simple one, should have:
- the scope: what will be done and where, in plain words;
- an itemised price in Turkish lira, with materials and labour, not just one total;
- whether VAT (KDV) is included;
- the planned duration and start date;
- what's excluded, for example repainting after a pipe repair;
- how payment works.
A voice note saying "around this much" is not a quote. If the price isn't in writing, it can change.
Red flags
- Won't give a price in writing, or only a single total for a big job.
- Wants to open several walls or strip a whole bathroom "to see what's wrong".
- Asks for full payment before starting.
- Pushes a bigger job than you asked for without explaining why ("the whole roof needs replacing").
- Changes the price on the day without new, visible problems.
- No photos of what was done, especially for work you can't see (inside walls, on a roof).
Payment
- Small jobs: pay on completion.
- Bigger jobs: a deposit for materials is normal, then stages linked to finished work, with the last payment after handover.
- Keep the written quote and all payment records.
- For anything your landlord or insurer should cover, get an invoice (fatura) and send them the quote before work starts.
The "foreigner price"
It exists, and many expats assume they're paying it. The protection is the same as above: an itemised quote you can compare line by line, from two or three firms for anything significant. If one quote is far higher, ask what's included rather than guessing.
At our firm, foreigners get the same itemised pricing as Turkish clients.
After the job
- Ask for before-and-after photos, especially of anything hidden.
- Test it: run the shower, check the meter, wait for rain.
- Keep the photos and quote; they matter if the problem comes back or when you hand the flat back.
When the landlord should pay
If you rent, many repairs are your landlord's or the building's responsibility. Get the written finding and quote to them before anything is done, so there's no argument about the bill. Our tenant guide explains how.
Or skip the hard part
We do roofing, damp and insulation, plumbing, tiling, renovation and cleaning, with one English-speaking contact, a written quote in English, and photos of every stage. If your landlord needs to approve it, we send them the quote in Turkish. See how we work or ask for a free quote.